Brief = transform the kitchen into an elegant, spotlessly finished timeless piece. Challenge = level out uneven surfaces and update utility connections to achieve the highest level of standard possible.
Process
The biggest challenge we stumbled across was when some of the doors and panels delivered by the retailer were faulty and had to be replaced - we had to wait an excessive 6 weeks. Something to take into account when selecting suppliers.
Result
A chic and functional kitchen that is made to last.
4
Flights of staircase (no lift) to keep us fit
6
Weeks of in-project delay caused by retailer's excessive lead times